Case History

Boiler assembly line

Boiler assembly line

This line has been designed and built to guarantee 30 manual assembly stations for domestic boilers.

The line consists of two sections of catenary about 80 meters long equipped with a triple chain with an idle central roller.
The pallet that slides on the catenary is composed of a base in burnished steel and a customized over-pallet which allows to house both the burner cap and the combustion chamber at the same time.
The return of the pallet will take place below the catenary itself using a lift system at the beginning and at the end of the line.
Each operator station is equipped with a PC with monitor, barcode reader, push-button panel and pneumatic tools for assembling the boilers.

GALLERY